Our Work
Below is a sampling of our work. Review a comprehensive list of our services here.
View Photo Gallery
Roadway
East West Connector Road
$13,453,000 project featuring 2 mile heavy civil roadway construction. Services included clearing, earthwork, basel, roadway curb, paving, stripe/sewage, storm drain, water main, electric, signalization, sound wall, landscape, and sidewalk services.
Waterfall Way
$10,000,000 project featuring 1.58 miles of 4-lane divided highway. Services included turnkey site development, clearing, excavation and grading, paving, drainage, lift station, force main, water main and reuse main.
Mayo Clinic
$1,015,000 project featuring 2,500 ft private roadway construction. Services included clearing, earthwork, base, roadway, curb/gutter, storm, retaining wall, and sidewalk.
Commercial/Industrial
General Electric Oil & Gas
$6,157,000 project featuring 600,000 sf of industrial/commercial building and associated parking. Services included turnkey site development, clearing, excavation and grading, paving, drainage, lift station, force main, and water main.
NorthPort Logistics Center
$4,105,000 project featuring 800,000 sf industrial building and associated parking. Services included turnkey site development, clearing, excavation and grading, paving, drainage, life station, force main, and water main.
U.S. Department of Homeland Security
$1,009,000 project featuring GSA Coast Guard/ICE facility. Services included clear, demolition, earth, base, roadway, paving, stripe/sign, LS/FM, gravity sewer, water, and retaining wall.
Subdivision
Caroline Hills
$1,039,000 project featuring 58 lot subdivision. Services included clearing, earthwork, paving, drainage, potable water, and sewage system.
Egret's Landing
$1,959,000 project featuring a 63-lot subdivision. Services included clearing, earthwork, grading, paving, drainage, potable water, and sewage system.
Old Still
$4,005,000 project featuring 124 lot subdivision. Services included erosion control, clear, earth, roadway, paving, stripe/signage, storm, gravity sewer, retaining wall, and sidewalk.
Utilities
Coastal Oaks
$2,851,000 project featuring infrastructure/access road to 37 lots in units 1, 4, and 7. Services included turnkey site development, clearing, excavation and grading, paving, drainage, box culverts, water main and reuse main.
JEA Easement
$735,000 project featuring utility construction - installed 6,000 linear ft of 4" force main. Services included lift station, temporary force main, force main, water main and reuse main constructed along right of way, with Toll Brothers (owner) and JEA sharing cost.
Alta Lakes Commerce Center
$5,609,000 project featuring industrial complex with 8,000 linear ft of concrete piping and more than 60 concrete structures. Services included turnkey site development, clearing, excavation and grading, paving, drainage, lift station, force main and water main.